US 281/Loop 410 Interchange Detail Plan
(Section 410 A)
This
section shows the interchange ramps along Loop 410 west of 281.
This section of 410 was widened in 2001 and preparations for the
interchange ramps were included. In fact, the foundations for the
future ramp columns were built at that time. The only major
traffic change here, besides the interchange entrances and exits, will
be the closure of the eastbound exit to Jones-Maltsberger-- it will be
replaced the exit for 281 instead. The Jones-Maltsberger exit will
be relocated to San Pedro.
Plans courtesy of TxDOT.
All plans are subject to change without notice. |
Click on an arrow below to
move
to the adjacent section
|
| |
 |
 |
|
|