US 281/Loop 410 Interchange Detail Plan
(Section 410 C)

Here is Loop 410 at Broadway.  The exit for US 281 from westbound 410 starts over Broadway, flies-over the access road, then continues over the railroad tracks and Wetmore Rd.  From there, the connector returns to ground level for a while (see Section 410 B).  This will also be the exit for Airport Blvd., which will split over to the access road just beyond Wetmore.  Also of note on this section is the replacement of the 410 westbound turnaround-- Crownhill will now serve as the turnaround approach road, and the intersection of Crownhill and the access road will be slightly reconfigured to accommodate this new role.  The 410 overpass at Broadway will also be slightly lengthened and the turnarounds there relocated.  The entrance ramp to eastbound 410 from Airport Blvd. will be about where the exit to Broadway is currently located.

Plans courtesy of TxDOT.  All plans are subject to change without notice.

Click on an arrow below to move
to the adjacent section

LEFT I-410
(Section B)
  I-410
(Section D)
RIGHT